Northern Avenue Storm Drain

Dates: Jul 23, 2009 to Jan 13, 2010
Location: Intersection of 59th Avenue & Northern, Glendale, AZ
Owner: City of Glendale
Contractor:
Sundt Construction

Description: Installation of 150′ of 82″ steel casing for a 72″ Duromax storm drain.
Challenges: Existing utility conflicts consisting of a 12″ HP gas to the south and an 8″ clay sewer line to the north, leaving 14′ between for small bore pit-32′ long x 12′ wide.
Method: Hand tunneling
Results: With the first phase complete, SSC then performed a second bore at the same location, just inches above the new storm drain. Utilizing trenchless auger boring SSC installed 130′ of 36″ casing for a new 20″ DIP waterline. This phase was completed in January, 2010.

View Project Video: