Kinder Morgan/EPNG Hackberry, AZ

Date: October 5, 2015 to October 16, 2015

Location: Hackberry, AZ
Owner: Kinder Morgan
Contractor: Kinder Morgan

Description:  Worked alongside Kinder Morgan pipeline crews to excavate and exposed underground natural gas lines.  SSC crews assisted Kinder Morgan crews with the sand blast, coat removal and the re-coat of the pipe.
Challenges: Remote location & soil conditions
Method: Vacuum potholing
Results: Une anomalies were identified and repaired without interrupting service to consumers and while protecting the environment.