Green Valley Transmission Upgrade

Dates:  11/20/12 – 4/30/13

Location: I-19 & Canoa Ranch Road

Owner: Tucson Electric Power

Contractor: Behan Excavating

Description:  Install 720’ of 42” Casing under I-19 to carry 14 – 6” Sch 80 PVC Conduits.

Method:  Horizontal Earth Auger Boring, Hand Tunneling, Open Cut

Read more: