Glendale Oasis Water Treatment Plant

Dates: May 06, 2010 to August 31, 2010
Location: Grand Ave & W Royal Palm Rd.
Owner: City of Glendale-Engineering Dept.
Contractor: Achen-Gardner Engineering

Description: Installed 310’ of 54” casing.
Challenges: Very tight tolerances for grade and alignment, extreme requirements for environmental sensitivity due to proximity to water treatment facility, detailed soil disturbance reporting requirements.
Method: Auger Bore
Results: The casing was installed with amazing accuracy on line and grade for a bore of this length and diameter, while meeting all of the environmental constraints and reporting requirements.