Gila Sub 8 Bridge Replacement

Dates:  5/19/15 – 7/15/15

Location:  Gila Bend

Owner:  Union Pacific Railroad

Contractor:  Allen Engineering

Description:  Install 60’ of 60” steel casing at one location under live railroad track, and 60’ of 72” steel casing at a second location underlive railroad track for construction of two new bridges

Method:  Horizontal Earth Auger Boring