FMI Bagdad Flotation Project

Dates: September 24, 2012 to October 25, 2012

Location: Bagdad, AZ
Owner: Freeport McMoran
Contractor: TIC/Kiewit

Description: Install 140’ of 72” casing under roadway.
Challenges: Working at an active mine under their stringent safety and operational procedures, having to control a very large casing bore to meet critical grade requirements.
Method: Jack and Bore
Results: Successfully installed casing and carrier line in line and grade with existing line for tie in.